IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

221

matching recommendations
Reset
SIC 3082 Unsupported Plastics Profile Shapes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0187 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $0 Not Implemented
IP0187 # 04 Y:2023 04 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $238 $1,514 Not Implemented
IP0187 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,797 $42,271 Not Implemented
IP0187 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $242 $74 Not Implemented
LE0517 # 05 Y:2022 05 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,886 $28,000 Not Implemented
LE0517 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,255 $400 Not Implemented
LE0517 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $125 $480 Implemented
LE0517 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,795 $12,000 Not Implemented
LE0517 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $52,000 $100,000 Implemented
LE0517 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $603 $40 Implemented
DL0196 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $20 Not Implemented
DL0196 # 08 Y:2021 08 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,629 $13,777 Not Implemented
DL0196 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,469 $18,418 Implemented
DL0196 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $1,842 $2,864 Implemented
DL0196 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,762 $1,037 Not Implemented
DL0196 # 03 Y:2021 03 2021 INSTALL TIMERS AND/OR THERMOSTATS $509 $165 Not Implemented
DL0196 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $849 $0 Implemented
DL0196 # 01 Y:2021 01 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,944 $6,452 Not Implemented
MZ0280 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,867 $24,520 Not Implemented
MZ0280 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,503 $24,934 Not Implemented
MZ0280 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $23,499 $2,058 Not Implemented
MZ0280 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $14,313 $9,858 Not Implemented
MZ0280 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,792 $2,148 Not Implemented
MZ0280 # 07 Y:2019 07 2019 PAY UTILITY BILLS ON TIME $5,205 $0 Not Implemented
MZ0280 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,016 $3,196 Not Implemented