IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

227

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0165 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,217 $3,300 Implemented
SD0165 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,369 $0 Implemented
SD0165 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,422 $650 Implemented
SD0165 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $24,199 $1,500 Implemented
SD0165 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $2,716 $900 Implemented
SD0165 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,237 $2,754 Implemented
SD0165 # 07 Y:1997 07 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $3,369 $4,110 Implemented
SD0165 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $3,812 $1,476 Implemented
SD0165 # 09 Y:1997 09 1997 $50,000 $0 Implemented
SD0165 # 10 Y:1997 10 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $12,265 $0 Implemented
SD0165 # 11 Y:1997 11 1997 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $2,250 $1,100 Implemented
SD0165 # 12 Y:1997 12 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $45,000 $3,500 Implemented
SD0165 # 13 Y:1997 13 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $296,400 $20,000 Implemented
AM0243 # 01 Y:1995 01 1995 USE POWER DURING OFF-PEAK PERIODS $12,650 $0 Implemented
AM0243 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $330 $300 Implemented
AM0243 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $200 Implemented
WV0060 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $472 $0 Implemented
WV0060 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $1,803 Implemented
WV0060 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $61 $168 Implemented
WV0060 # 04 Y:1995 04 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,804 $2,600 Implemented
MA0327 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,783 $0 Implemented
MA0327 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,441 $36,400 Implemented
MA0327 # 04 Y:1995 04 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $9,488 $0 Implemented
MA0327 # 05 Y:1995 05 1995 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,033 $0 Implemented
MA0327 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,903 $1,500 Implemented