IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0561 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,950 $12,995 n/a
LE0561 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,803 $5,143 n/a
LE0561 # 06 Y:2024 06 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $997 $3,220 n/a
LE0561 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,883 $1,832 n/a
LE0561 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,626 $100 n/a
LE0561 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,473 $1,400 n/a
MZ0350 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $60,709 $140,732 Not Implemented
MZ0350 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,082 $600 Implemented
MZ0350 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,826 $2,520 Not Implemented
MZ0350 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $9,435 $9,200 Implemented
MZ0350 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,815 $440 Not Implemented
MZ0345 # 07 Y:2023 07 2023 MAKE A NEW BY-PRODUCT $1,080,000 $1,350,000 Not Implemented
MZ0345 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,404 $14,030 Implemented
MZ0345 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,738 $3,090 Implemented
MZ0345 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,154 $220 Implemented
MZ0345 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,287 $840 Implemented
MZ0345 # 06 Y:2023 06 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,711 $1,945 Implemented
MZ0345 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,065 $22,618 Implemented
DL0195 # 12 Y:2021 12 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,495 $34,144 Implemented
DL0195 # 10 Y:2021 10 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,190 $6,328 Not Implemented
DL0195 # 04 Y:2021 04 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $48,560 $210,000 Implemented
DL0195 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,950 $8,214 Implemented
DL0195 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $3,580 $5,500 Not Implemented
DL0195 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,430 $7,309 Implemented
DL0195 # 11 Y:2021 11 2021 INSTALL OCCUPANCY SENSORS $290 $270 Not Implemented