Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
399
matching recommendationsSIC | 3083 | Laminated Plastics Plate & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0021 # 02 Y:1985 | 02 | 1985 | BURN WOOD BY-PRODUCTS FOR HEAT | $2,010 | $8,450 | Implemented |
MA0021 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,822 | $105 | Implemented |
MA0021 # 04 Y:1985 | 04 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $435 | $100 | Not Implemented |
MA0021 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,005 | $3,702 | Not Implemented |
MA0021 # 06 Y:1985 | 06 | 1985 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,902 | $4,380 | Not Implemented |
MA0007 # 01 Y:1984 | 01 | 1984 | INSTALL SET-BACK TIMERS | $543 | $650 | Implemented |
MA0007 # 02 Y:1984 | 02 | 1984 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $5,690 | $3,000 | Implemented |
MA0007 # 03 Y:1984 | 03 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,692 | $70,668 | Not Implemented |
UD0121 # 01 Y:1984 | 01 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,826 | $28,200 | Not Implemented |
UD0121 # 02 Y:1984 | 02 | 1984 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,578 | $15,000 | Not Implemented |
KU0103 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $814 | $862 | Not Implemented |
KU0103 # 02 Y:1983 | 02 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,030 | $100 | Not Implemented |
KU0103 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $115 | $180 | Not Implemented |
KU0103 # 05 Y:1983 | 05 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $335 | $450 | Not Implemented |
KU0103 # 06 Y:1983 | 06 | 1983 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $85 | $0 | Not Implemented |
KU0103 # 07 Y:1983 | 07 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $1,466 | $89 | Not Implemented |
KU0103 # 08 Y:1983 | 08 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,369 | $200 | Not Implemented |
KU0103 # 09 Y:1983 | 09 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $81 | $0 | Not Implemented |
KU0103 # 10 Y:1983 | 10 | 1983 | INSULATE BARE EQUIPMENT | $4,862 | $2,500 | Not Implemented |
GT0181 # 01 Y:1983 | 01 | 1983 | REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES | $20,000 | $28,000 | Not Implemented |
GT0181 # 02 Y:1983 | 02 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,422 | $9,000 | Not Implemented |
GT0181 # 03 Y:1983 | 03 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,800 | $65,900 | Not Implemented |
GT0181 # 04 Y:1983 | 04 | 1983 | OPTIMIZE PLANT POWER FACTOR | $5,360 | $12,000 | Not Implemented |
GT0181 # 05 Y:1983 | 05 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,800 | $1,000 | Not Implemented |