IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0021 # 02 Y:1985 02 1985 BURN WOOD BY-PRODUCTS FOR HEAT $2,010 $8,450 Implemented
MA0021 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,822 $105 Implemented
MA0021 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $435 $100 Not Implemented
MA0021 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,005 $3,702 Not Implemented
MA0021 # 06 Y:1985 06 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,902 $4,380 Not Implemented
MA0007 # 01 Y:1984 01 1984 INSTALL SET-BACK TIMERS $543 $650 Implemented
MA0007 # 02 Y:1984 02 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,690 $3,000 Implemented
MA0007 # 03 Y:1984 03 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,692 $70,668 Not Implemented
UD0121 # 01 Y:1984 01 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,826 $28,200 Not Implemented
UD0121 # 02 Y:1984 02 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,578 $15,000 Not Implemented
KU0103 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $862 Not Implemented
KU0103 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,030 $100 Not Implemented
KU0103 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $115 $180 Not Implemented
KU0103 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $335 $450 Not Implemented
KU0103 # 06 Y:1983 06 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $85 $0 Not Implemented
KU0103 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,466 $89 Not Implemented
KU0103 # 08 Y:1983 08 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,369 $200 Not Implemented
KU0103 # 09 Y:1983 09 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $81 $0 Not Implemented
KU0103 # 10 Y:1983 10 1983 INSULATE BARE EQUIPMENT $4,862 $2,500 Not Implemented
GT0181 # 01 Y:1983 01 1983 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $20,000 $28,000 Not Implemented
GT0181 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,422 $9,000 Not Implemented
GT0181 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,800 $65,900 Not Implemented
GT0181 # 04 Y:1983 04 1983 OPTIMIZE PLANT POWER FACTOR $5,360 $12,000 Not Implemented
GT0181 # 05 Y:1983 05 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,800 $1,000 Not Implemented