Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 3083 | Laminated Plastics Plate & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0245 # 09 Y:2000 | 09 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $173 | $0 | Not Implemented |
IA0245 # 08 Y:2000 | 08 | 2000 | USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY | $1,500 | $6,500 | Not Implemented |
IA0245 # 07 Y:2000 | 07 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $97,398 | $100,000 | Implemented |
IA0245 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114 | $113 | Implemented |
IA0245 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $142 | $335 | Not Implemented |
IA0245 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $186 | $25 | Implemented |
IA0245 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $791 | $0 | Implemented |
IA0245 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,424 | $3,164 | Not Implemented |
IA0245 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,446 | $0 | Not Implemented |
HO0228 # 08 Y:2000 | 08 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $9,360 | $25,000 | Not Implemented |
HO0228 # 07 Y:2000 | 07 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $9,360 | $5,000 | Implemented |
HO0228 # 09 Y:2000 | 09 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,880 | $2,340 | Implemented |
HO0228 # 10 Y:2000 | 10 | 2000 | PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING | $10,395 | $3,000 | Implemented |
HO0228 # 11 Y:2000 | 11 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $68,250 | $300,000 | Implemented |
HO0228 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,440 | $1,500 | Implemented |
HO0228 # 13 Y:2000 | 13 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $6,240 | $2,500 | Not Implemented |
HO0228 # 14 Y:2000 | 14 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $39,000 | $6,000 | Implemented |
HO0228 # 15 Y:2000 | 15 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,456 | $6,500 | Not Implemented |
HO0228 # 16 Y:2000 | 16 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $780 | $750 | Not Implemented |
HO0228 # 17 Y:2000 | 17 | 2000 | REDUCE OR ELIMINATE WASTE | $8,250 | $0 | Implemented |
HO0228 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,810 | $778 | Implemented |
HO0228 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $200 | Implemented |
HO0228 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $538 | $15 | Implemented |
HO0228 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $455 | $1,000 | Not Implemented |
HO0228 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,158 | $0 | Implemented |