Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
338
matching recommendationsSIC | 3084 | Plastics Pipe |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1065 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,073 | $12,233 | Implemented |
OK1065 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,433 | $2,429 | Implemented |
OK1065 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,263 | $0 | Implemented |
OK1065 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,273 | $21,539 | Implemented |
OK1057 # 01 Y:2021 | 01 | 2021 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $10,601 | $1,701 | Implemented |
OK1057 # 02 Y:2021 | 02 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,483 | $56,000 | Implemented |
OK1057 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,960 | $0 | Implemented |
SF0575 # 11 Y:2021 | 11 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,353 | $19,986 | Implemented |
SF0575 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,311 | $966 | Implemented |
SF0575 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $0 | Implemented |
SF0575 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,624 | $18,284 | Implemented |
SF0575 # 12 Y:2021 | 12 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,554 | $6,764 | Implemented |
SF0575 # 09 Y:2021 | 09 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,137 | $1,513 | Implemented |
SF0575 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,559 | $16,052 | Implemented |
SF0575 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,642 | $1,513 | Implemented |
SF0575 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,748 | $1,047 | Implemented |
CO0741 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,794 | $0 | Implemented |
CO0741 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,303 | $3,500 | Implemented |
CO0741 # 04 Y:2021 | 04 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,264 | $21,000 | Implemented |
CO0741 # 07 Y:2021 | 07 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $51,454 | $3,624 | Implemented |
CO0741 # 03 Y:2021 | 03 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,984 | $0 | Implemented |
NL0057 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,345 | $11,175 | Implemented |
NL0057 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,211 | $2,500 | Implemented |
NL0057 # 05 Y:2021 | 05 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $4,782 | $15,170 | Implemented |
MZ0305 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,689 | $240 | Implemented |