IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

703

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0453 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $678 $81 Implemented
IA0453 # 09 Y:2010 09 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,215 $3,400 Implemented
MZ0043 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $20,400 Implemented
MZ0043 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,634 $860 Implemented
MZ0043 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,319 $480 Implemented
MZ0043 # 04 Y:2009 04 2009 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $627 $1,800 Implemented
MZ0043 # 05 Y:2009 05 2009 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,387 $3,600 Implemented
MZ0043 # 06 Y:2009 06 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,995 $1 Implemented
MZ0043 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,009 $500 Not Implemented
MZ0043 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $192,075 $12,080 Implemented
MZ0043 # 09 Y:2009 09 2009 MOVE BOILER TO MORE EFFICIENT LOCATION $10,937 $3,000 Implemented
TT0035 # 01 Y:2008 01 2008 $15,307 $5,600 Implemented
TT0035 # 02 Y:2008 02 2008 $5,446 $12,785 Implemented
TT0035 # 03 Y:2008 03 2008 $1,792 $8,800 Not Implemented
TT0035 # 04 Y:2008 04 2008 $5,453 $250 Not Implemented
TT0035 # 05 Y:2008 05 2008 $7,885 $25,000 Implemented
UF0418 # 15 Y:2008 15 2008 MAINTAIN MACHINES TO REDUCE LEAKS $6,175 $161 Implemented
UF0418 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $20,962 $1,500 Not Implemented
UF0418 # 02 Y:2008 02 2008 INSTALL COMMON HEADER ON COMPRESSORS $4,076 $2,560 Implemented
UF0418 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,047 $1,060 Implemented
UF0418 # 16 Y:2008 16 2008 CLEAN FOULING FROM WATER LINES REGULARLY $2,344 $7,838 Implemented
UF0418 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,106 $0 Not Implemented
UF0418 # 06 Y:2008 06 2008 INSTALL TIMERS AND/OR THERMOSTATS $16,637 $30,850 Not Implemented
UF0418 # 14 Y:2008 14 2008 CHECK FOR ACCURACY OF UTILITY / POWER METERS $170,526 $5,967 Not Implemented
UF0418 # 13 Y:2008 13 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,442 $82,588 Not Implemented