Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
683
matching recommendationsSIC | 3084 | Plastics Pipe |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0575 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $0 | Implemented |
SF0575 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,311 | $966 | Implemented |
SF0575 # 02 Y:2021 | 02 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,510 | $0 | Not Implemented |
SF0575 # 12 Y:2021 | 12 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,554 | $6,764 | Implemented |
SF0575 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,624 | $18,284 | Implemented |
SF0575 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,748 | $1,047 | Implemented |
CO0741 # 07 Y:2021 | 07 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $51,454 | $3,624 | Implemented |
CO0741 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,303 | $3,500 | Implemented |
CO0741 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,794 | $0 | Implemented |
CO0741 # 08 Y:2021 | 08 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,987 | $33,250 | Not Implemented |
CO0741 # 03 Y:2021 | 03 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,984 | $0 | Implemented |
CO0741 # 02 Y:2021 | 02 | 2021 | INSTALL WIND POWERED ELECTRIC GENERATOR | $38,875 | $547,800 | Not Implemented |
UU0190 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,058 | $778 | Not Implemented |
CO0741 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $48,927 | $491,439 | Not Implemented |
UU0190 # 04 Y:2021 | 04 | 2021 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,942 | $2,900 | Not Implemented |
UU0190 # 02 Y:2021 | 02 | 2021 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $8,939 | $3,000 | Not Implemented |
UU0190 # 01 Y:2021 | 01 | 2021 | INSULATE BARE EQUIPMENT | $9,772 | $5,582 | Not Implemented |
CO0741 # 04 Y:2021 | 04 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,264 | $21,000 | Implemented |
UU0190 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Not Implemented |
OK1055 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,307 | $26,424 | Not Implemented |
OK1055 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,454 | $1,872 | Not Implemented |
OK1055 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,704 | $1,561 | Not Implemented |
OK1055 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,169 | $0 | Not Implemented |
OK1055 # 01 Y:2021 | 01 | 2021 | INCREASE USE OF AUTOMATION | $444,132 | $165,066 | Not Implemented |
TT0256 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,816 | $5,000 | Not Implemented |