IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

683

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0540 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,257 $70 Not Implemented
IA0540 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $979 $4,550 Not Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0921 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,026 $832 Not Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
OK0916 # 01 Y:2015 01 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $12,740 $0 Implemented
OK0916 # 02 Y:2015 02 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,433 $20,074 Not Implemented
OK0916 # 03 Y:2015 03 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $30,382 $0 Implemented
OK0916 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,579 $3,451 Implemented
OK0916 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $390 $1,805 Not Implemented
OK0916 # 06 Y:2015 06 2015 DISCONNECT BALLASTS $2,547 $2,064 Not Implemented
OK0916 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,606 $5,687 Not Implemented
OK0916 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $3,788 $26,134 Not Implemented
OK0916 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,642 $1,150 Implemented
OK0916 # 10 Y:2015 10 2015 INSULATE BARE EQUIPMENT $11,269 $12,672 Not Implemented
OK0916 # 11 Y:2015 11 2015 INSTALL SET-BACK TIMERS $204 $23 Not Implemented
OK0902 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,929 $24,297 Not Implemented
OK0902 # 02 Y:2015 02 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $739 $468 Implemented
OK0902 # 03 Y:2015 03 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,033 $14,760 Not Implemented
OK0902 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,160 $2,367 Not Implemented
OK0902 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $1,358 $3,750 Not Implemented
OK0902 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,781 $8,612 Not Implemented
OK0902 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,028 $3,948 Not Implemented