Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 3084 | Plastics Pipe |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0305 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,689 | $240 | Implemented |
MZ0305 # 05 Y:2021 | 05 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,340 | $5,200 | Implemented |
MZ0305 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $579 | $320 | Implemented |
MZ0305 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,350 | $93,000 | Implemented |
MZ0305 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,692 | $44,928 | Implemented |
MZ0305 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,825 | $9,000 | Implemented |
MZ0043 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $20,400 | Implemented |
MZ0043 # 09 Y:2009 | 09 | 2009 | MOVE BOILER TO MORE EFFICIENT LOCATION | $10,937 | $3,000 | Implemented |
MZ0043 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $192,075 | $12,080 | Implemented |
MZ0043 # 07 Y:2009 | 07 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,009 | $500 | Not Implemented |
MZ0043 # 06 Y:2009 | 06 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,995 | $1 | Implemented |
MZ0043 # 05 Y:2009 | 05 | 2009 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,387 | $3,600 | Implemented |
MZ0043 # 04 Y:2009 | 04 | 2009 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $627 | $1,800 | Implemented |
MZ0043 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $2,319 | $480 | Implemented |
MZ0043 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,634 | $860 | Implemented |
MZ0021 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $40 | $190 | Not Implemented |
MZ0021 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $855 | $740 | Not Implemented |
MZ0021 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,112 | $21,425 | Implemented |
MZ0021 # 04 Y:2008 | 04 | 2008 | INSTALL SPECTRAL REFLECTORS / DELAMP | $565 | $40 | Implemented |
MZ0021 # 03 Y:2008 | 03 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $5,000 | Implemented |
MZ0021 # 02 Y:2008 | 02 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,575 | $900 | Implemented |
MZ0021 # 01 Y:2008 | 01 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $20,665 | $20,000 | Implemented |
MO0265 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $316 | $379 | Implemented |
MO0265 # 07 Y:1999 | 07 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $52,560 | $14,000 | Not Implemented |
MO0265 # 06 Y:1999 | 06 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $62,546 | $14,500 | Implemented |