IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0256 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $2,540 $588 Not Implemented
TT0256 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $40 Not Implemented
TT0256 # 07 Y:2021 07 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,460 $250 Not Implemented
TT0256 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $825 $3,000 Not Implemented
TT0256 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,667 $2,040 Not Implemented
TT0256 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,866 $29,886 Not Implemented
TT0256 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,560 $150 Not Implemented
TT0256 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,816 $5,000 Not Implemented
TT0256 # 02 Y:2021 02 2021 METER WASTE WATER $10,722 $2,150 Not Implemented
TT0256 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,092 $12,000 Not Implemented
TT0035 # 02 Y:2008 02 2008 $5,446 $12,785 Implemented
TT0035 # 05 Y:2008 05 2008 $7,885 $25,000 Implemented
TT0035 # 04 Y:2008 04 2008 $5,453 $250 Not Implemented
TT0035 # 03 Y:2008 03 2008 $1,792 $8,800 Not Implemented
TT0035 # 01 Y:2008 01 2008 $15,307 $5,600 Implemented
TN0283 # 07 Y:1986 07 1986 INSULATE BARE EQUIPMENT $849 $276 Not Implemented
TN0283 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,130 $2,600 Implemented
TN0283 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $3,742 $660 Implemented
TN0283 # 04 Y:1986 04 1986 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,182 $940 Implemented
TN0283 # 02 Y:1986 02 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,904 $0 Not Implemented
TN0283 # 01 Y:1986 01 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,143 $20,000 Implemented
TN0229 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $3,128 $340 Not Implemented
TN0229 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $96 $26 Implemented
TN0229 # 04 Y:1984 04 1984 INSTALL SET-BACK TIMERS $1,802 $0 Not Implemented
TN0229 # 03 Y:1984 03 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $786 $800 Not Implemented