Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
14
matching recommendationsSIC | 3084 | Plastics Pipe |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0090 # 01 Y:1990 | 01 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $64,713 | $5,000 | Implemented |
OR0090 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $412 | $509 | Implemented |
OR0090 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $1,562 | $3,277 | Not Implemented |
OR0090 # 04 Y:1990 | 04 | 1990 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,098 | $2,400 | Not Implemented |
OR0090 # 05 Y:1990 | 05 | 1990 | OPTIMIZE PLANT POWER FACTOR | $687 | $1,950 | Not Implemented |
OR0090 # 06 Y:1990 | 06 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,669 | $22,569 | Not Implemented |
KU0306 # 01 Y:1990 | 01 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $12,917 | $1,500 | Not Implemented |
KU0306 # 02 Y:1990 | 02 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,435 | $200 | Not Implemented |
KU0306 # 03 Y:1990 | 03 | 1990 | OPTIMIZE PLANT POWER FACTOR | $20,507 | $33,600 | Not Implemented |
KU0306 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,107 | $1,966 | Not Implemented |
KU0306 # 05 Y:1990 | 05 | 1990 | IMPROVE LUBRICATION PRACTICES | $8,748 | $0 | Implemented |
KU0306 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,643 | $4,359 | Implemented |
KU0306 # 07 Y:1990 | 07 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,326 | $0 | Not Implemented |
KU0306 # 08 Y:1990 | 08 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $229 | $0 | Not Implemented |