Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0906 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $949 | $1,754 | Implemented |
GT0906 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,228 | $13,889 | Implemented |
GT0906 # 01 Y:2017 | 01 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,227 | $1,200 | Implemented |
GT0873 # 06 Y:2010 | 06 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,661 | $775 | Implemented |
GT0873 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $816 | $4,400 | Implemented |
GT0873 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $3,777 | $10,640 | Implemented |
GT0873 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,353 | $0 | Implemented |
GT0685 # 01 Y:2000 | 01 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,280 | $0 | Implemented |
GT0685 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,955 | $0 | Implemented |
GT0685 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $28,840 | $7,000 | Implemented |
GT0685 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $714 | $500 | Implemented |
GT0685 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $13,650 | $11,650 | Implemented |
GT0669 # 08 Y:1999 | 08 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $550 | $200 | Implemented |
GT0669 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,844 | $32,000 | Implemented |
GT0669 # 06 Y:1999 | 06 | 1999 | KEEP EQUIPMENT CLEAN | $2,200 | $1,000 | Implemented |
GT0669 # 05 Y:1999 | 05 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $113,437 | $0 | Implemented |
GT0669 # 03 Y:1999 | 03 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,935 | $6,800 | Implemented |
GT0669 # 02 Y:1999 | 02 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $641 | $1,250 | Implemented |
GT0669 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,756 | $60,795 | Implemented |
GT0554 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,760 | $21,380 | Implemented |
GT0554 # 09 Y:1995 | 09 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,693 | $2,552 | Implemented |
GT0554 # 05 Y:1995 | 05 | 1995 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $12,722 | $20,000 | Implemented |
GT0554 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,153 | $38,780 | Implemented |
GT0554 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,575 | $9,118 | Implemented |