IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

884

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0232 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $262,532 $850,000 Not Implemented
UF0232 # 08 Y:1999 08 1999 $15,848 $75,000 Implemented
GT0669 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,756 $60,795 Implemented
GT0669 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $641 $1,250 Implemented
GT0669 # 03 Y:1999 03 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,935 $6,800 Implemented
GT0669 # 04 Y:1999 04 1999 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $10,870 $7,700 Not Implemented
GT0669 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $113,437 $0 Implemented
GT0669 # 06 Y:1999 06 1999 KEEP EQUIPMENT CLEAN $2,200 $1,000 Implemented
GT0669 # 07 Y:1999 07 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,844 $32,000 Implemented
GT0669 # 08 Y:1999 08 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $550 $200 Implemented
GT0669 # 09 Y:1999 09 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $108,000 $100,000 Not Implemented
SF0173 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $358 $451 Not Implemented
SF0173 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $269 $506 Not Implemented
SF0173 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $423 $1,200 Not Implemented
SF0173 # 04 Y:1999 04 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,455 $7,000 Not Implemented
SF0173 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,305 $14,475 Not Implemented
SF0173 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $56,000 $0 Not Implemented
SF0173 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,500 $164 Not Implemented
SF0173 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $112,000 $49,860 Not Implemented
UF0219 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $303,502 $162,816 Not Implemented
UF0219 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,164 $53 Not Implemented
UF0219 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,814 $2,600 Implemented
UF0219 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,141 $0 Not Implemented
UF0219 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,800 $0 Not Implemented
UF0219 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $820 $1,200 Implemented