IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

864

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0219 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,164 $53 Not Implemented
UF0219 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,814 $2,600 Implemented
UF0219 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,141 $0 Not Implemented
UF0219 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,800 $0 Not Implemented
UF0219 # 06 Y:1999 06 1999 $820 $1,200 Implemented
UF0219 # 07 Y:1999 07 1999 $7,893 $0 Not Implemented
MA0433 # 01 Y:1999 01 1999 $18,033 $25,200 Not Implemented
MA0433 # 02 Y:1999 02 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,704 $5,262 Not Implemented
MA0433 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,317 $3,950 Implemented
MA0433 # 04 Y:1999 04 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,414 $0 Not Implemented
MA0433 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,135 $0 Not Implemented
MA0433 # 06 Y:1999 06 1999 $2,000 $700 Not Implemented
MA0433 # 07 Y:1999 07 1999 $6,150 $1,200 Not Implemented
AS0243 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,432 $3,754 Not Implemented
AS0243 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,379 $225 Not Implemented
AS0243 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,369 $5,320 Not Implemented
AS0243 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $5,434 Not Implemented
AS0243 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,800 $80 Implemented
AS0243 # 06 Y:1999 06 1999 $13,172 $5,400 Not Implemented
AS0243 # 07 Y:1999 07 1999 $142,183 $196,000 Not Implemented
KU0508 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,850 $5,030 Implemented
KU0508 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,900 $7,180 Implemented
KU0508 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $470 $350 Implemented
KU0508 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $100 Implemented
KU0508 # 05 Y:1998 05 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $530 $1,500 Not Implemented