IAC logo
IAC Assessment: NC0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Plastic bottles
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 160,000
Annual Production 400,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $418,804 16,614,596 kWh $0.03
Electricity Demand $274,478 29,060 kW-months/year $9.45
Electricity Fees $23,191 - $ -
Natural Gas $8,969 1,388 MMBtu $6.46
TOTAL ENERGY COSTS $725,442
RECOMMENDED SAVINGS* $129,989 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,831
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$762
Cost:
$3,710
$373 14,654 $389 41 - - - - $373
14,654
kWh
$389
41
kW-months/year
-
-
$
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,831
Cost:
$3,617
$2,537 100,821 $1,294 137 - - - - $2,537
100,821
kWh
$1,294
137
kW-months/year
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,422
Cost:
$56
$941 37,222 $481 51 - - - - $941
37,222
kWh
$481
51
kW-months/year
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,211
Cost:
$3,850
$430 16,999 $781 83 - - - - $430
16,999
kWh
$781
83
kW-months/year
-
-
$
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$35,491
Cost:
$500
$6,893 214,537 $11,078 1,176 $17,520 - - - $6,893
214,537
kWh
$11,078
1,176
kW-months/year
$17,520
-
$
-
-
$
06: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$64,272
Cost:
$64,142
$42,506 1,687,280 $21,766 2,311 - - - - $42,506
1,687,280
kWh
$21,766
2,311
kW-months/year
-
-
$
-
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$23,000
Cost:
$1,000
- - - - $15,000 - $8,000 - -
-
kWh
-
-
kW-months/year
$15,000
-
$
$8,000
-
$
TOTAL RECOMMENDED Savings:
$129,989
Cost:
$76,875
$53,680 2,071,513 $35,789 3,799 $32,520 - $8,000 - $53,680
2,071,513
kWh
$35,789
3,799
kW-months/year
$32,520
-
$
$8,000
-
$
TOTAL IMPLEMENTED Savings:
$3,831
Cost:
$3,617
$2,537 100,821 $1,294 137 - - - - $2,537
100,821
kWh
$1,294
137
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes