IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

884

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0158 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $87 Not Implemented
UL0158 # 04 Y:1996 04 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,525 $3,500 Not Implemented
UL0158 # 05 Y:1996 05 1996 RECOVER AND REUSE WASTE MATERIAL $2,984 $0 Not Implemented
WI0268 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,745 $1,950 Not Implemented
WI0268 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,104 $0 Not Implemented
WI0268 # 03 Y:1996 03 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,583 $0 Not Implemented
WI0268 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $267 $400 Not Implemented
WI0268 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,400 $0 Not Implemented
WI0268 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,631 $740 Not Implemented
WI0268 # 07 Y:1996 07 1996 CONVERT TO AQUEOUS CLEANING $1,850 $4,500 Not Implemented
WI0268 # 08 Y:1996 08 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,701 $0 Not Implemented
WI0268 # 09 Y:1996 09 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,415 $500 Not Implemented
WI0268 # 10 Y:1996 10 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $353 $0 Not Implemented
WI0268 # 11 Y:1996 11 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $201 $700 Not Implemented
KU0459 # 01 Y:1996 01 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $20,000 $1,833 Implemented
KU0459 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,330 $15,534 Implemented
KU0459 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,967 $4,716 Not Implemented
KU0459 # 04 Y:1996 04 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,896 $1,208 Not Implemented
KU0459 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,991 $4,551 Not Implemented
KU0459 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $2,927 $920 Not Implemented
KU0459 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,489 $4,140 Not Implemented
KU0459 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $688 $0 Implemented
KU0459 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $480 Implemented
UD0490 # 01 Y:1996 01 1996 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $55,282 $12,000 Implemented
UD0490 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,981 $0 Not Implemented