Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
884
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0215 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,033 | $38,000 | Not Implemented |
DL0215 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $131,800 | $250,000 | Not Implemented |
DL0215 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,640 | $3,000 | Implemented |
DL0215 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $222,700 | $184,000 | Implemented |
DL0215 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $125,900 | $30,000 | Not Implemented |
DL0215 # 01 Y:2023 | 01 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $29,690 | $0 | Not Implemented |
CL2114 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,537 | $0 | n/a |
CL2114 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $1,148 | $1,615 | n/a |
CL2114 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,331 | $0 | n/a |
CL2114 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $10,678 | $4,250 | n/a |
CL2114 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,420 | $37,500 | n/a |
DL0194 # 06 Y:2021 | 06 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,000 | $114 | Not Implemented |
DL0194 # 05 Y:2021 | 05 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $3,230 | $13,750 | Implemented |
DL0194 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,663 | $1,698 | Implemented |
DL0194 # 03 Y:2021 | 03 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,097 | $1,527 | Implemented |
DL0194 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $52,057 | $15,000 | Not Implemented |
DL0194 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,325 | $475 | Implemented |
NL0053 # 01 Y:2020 | 01 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $46,240 | $187,000 | Not Implemented |
NL0053 # 10 Y:2020 | 10 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $637 | $630 | Not Implemented |
NL0053 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $643 | $1,643 | Not Implemented |
NL0053 # 08 Y:2020 | 08 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,080 | $56 | Implemented |
NL0053 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,612 | $1,245 | Not Implemented |
NL0053 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,013 | $1,500 | Implemented |
NL0053 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,360 | $56 | Implemented |
NL0053 # 04 Y:2020 | 04 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,704 | $12,000 | Implemented |