IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0938 # 12 Y:2016 12 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,836 $1,371,615 Not Implemented
OK0938 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $34,651 $40,660 Not Implemented
OK0938 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,405 $59,664 Implemented
OK0938 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,558 $4,930 Not Implemented
OK0938 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,124 $3,000 Not Implemented
OK0938 # 05 Y:2016 05 2016 INSTALL SET-BACK TIMERS $317 $344 Implemented
OK0938 # 06 Y:2016 06 2016 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $5,044 $44,525 Not Implemented
OK0938 # 08 Y:2016 08 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,294 $5,000 Not Implemented
OK0938 # 09 Y:2016 09 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,693 $3,236 Implemented
OK0938 # 10 Y:2016 10 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $372,611 $70,000 Not Implemented
OK0938 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $26,300 $47,542 Implemented
OK0938 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $4,491 $2,935 Not Implemented
OK0806 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,602 $414 Implemented
OK0806 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $109,231 $57,500 Not Implemented
OK0806 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $37,707 Implemented
OK0806 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,177 $38,005 Implemented
OK0806 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $7,724 Implemented
OK0806 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,172 $1,600 Implemented
OK0806 # 07 Y:2011 07 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,222 $870 Not Implemented
OK0806 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $6,859 $2,964 Not Implemented
OK0806 # 09 Y:2011 09 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,676 $7,130 Not Implemented
OK0711 # 05 Y:2005 05 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Not Implemented
OK0711 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $603 $4,626 Not Implemented
OK0711 # 07 Y:2005 07 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $215,784 $8,400 Not Implemented
OK0711 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $846 $811 Not Implemented