IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0877 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,060 $0 Implemented
AM0877 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $35,600 $148,000 Implemented
AM0877 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,700 $32,850 Implemented
AM0877 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,440 $105 Implemented
AM0877 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,290 $74,067 Implemented
AM0877 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,900 $60,360 Implemented
AM0877 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $7,230 $675 Not Implemented
AM0724 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $200 Implemented
AM0724 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $4,690 Implemented
AM0724 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $4,040 $1,010 Not Implemented
AM0724 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,720 $0 Implemented
AM0724 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,300 $16,500 Not Implemented
AM0724 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $126 $210 Implemented
AM0724 # 06 Y:2017 06 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,370 $2,000 Not Implemented
AM0724 # 05 Y:2017 05 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,020 $0 Implemented
AM0597 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,070 $1,748 Not Implemented
AM0597 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $800 $0 Not Implemented
AM0597 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,970 $0 Implemented
AM0597 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,470 $750 Implemented
AM0597 # 02 Y:2011 02 2011 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,900 $0 Implemented
AM0597 # 01 Y:2011 01 2011 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $21,840 $0 Implemented
AM0589 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,960 $90 Implemented
AM0589 # 06 Y:2011 06 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,575 $0 Implemented
AM0589 # 05 Y:2011 05 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,885 $0 Not Implemented
AM0589 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $225 Implemented