IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0732 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,586 $0 Not Implemented
OR0732 # 05 Y:2020 05 2020 USE SYNTHETIC LUBRICANT $9,084 $0 Not Implemented
OR0732 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,898 $0 Not Implemented
OR0732 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,849 $0 Not Implemented
OR0732 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,378 $0 Implemented
OR0732 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $26,977 $0 Not Implemented
OR0588 # 06 Y:2012 06 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $631 $4,131 Not Implemented
OR0588 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $17,738 $17,500 Implemented
OR0588 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,053 $8,053 Implemented
OR0588 # 03 Y:2012 03 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,021 $10,000 Not Implemented
OR0588 # 02 Y:2012 02 2012 AVOID FROST FORMATION ON EVAPORATORS $8,968 $0 Not Implemented
OR0588 # 01 Y:2012 01 2012 IMPROVE HANDLING PRACTICES $7,884 $60 Implemented
OR0318 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $19,148 $101,000 Not Implemented
OR0318 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,184 $16,818 Implemented
OR0318 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $12,200 $2,450 Implemented
OR0318 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,050 $24,750 Not Implemented
OR0318 # 02 Y:1998 02 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $107,110 $303,860 Not Implemented
OR0318 # 01 Y:1998 01 1998 RECOVER AND REUSE WASTE MATERIAL $173,800 $84,400 Not Implemented
OR0205 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $2,000 Implemented
OR0205 # 07 Y:1994 07 1994 REDUCE SCRAP PRODUCTION $7,200 $16,420 Implemented
OR0205 # 06 Y:1994 06 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $845 $0 Implemented
OR0205 # 05 Y:1994 05 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $4,373 $14,067 Not Implemented
OR0205 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $1,026 $1,400 Not Implemented
OR0205 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $6,475 Implemented
OR0205 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,085 $3,659 Implemented