Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0088 # 07 Y:1997 | 07 | 1997 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $557 | $1,500 | Implemented |
UM0088 # 06 Y:1997 | 06 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,519 | $0 | Implemented |
UM0088 # 05 Y:1997 | 05 | 1997 | MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING | $16,379 | $1,440 | Implemented |
UM0088 # 04 Y:1997 | 04 | 1997 | IMPROVE COMBUSTION CONTROL CAPABILITY | $13,512 | $22,440 | Implemented |
UM0088 # 03 Y:1997 | 03 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $36,864 | $37,700 | Implemented |
UM0088 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,346 | $12,020 | Implemented |
UM0088 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,784 | $4,207 | Implemented |
MA0391 # 02 Y:1997 | 02 | 1997 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,846 | $900 | Not Implemented |
MA0391 # 07 Y:1997 | 07 | 1997 | INSTALL SET-BACK TIMERS | $10,158 | $30,560 | Not Implemented |
MA0391 # 06 Y:1997 | 06 | 1997 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $947 | $520 | Not Implemented |
MA0391 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,783 | $4,225 | Not Implemented |
MA0391 # 04 Y:1997 | 04 | 1997 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $4,656 | $3,770 | Not Implemented |
MA0391 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,321 | $9,750 | Not Implemented |
MA0391 # 01 Y:1997 | 01 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,296 | $791 | Not Implemented |
SF0107 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,990 | $16,568 | Implemented |
SF0107 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $435 | $360 | Implemented |
SF0107 # 04 Y:1997 | 04 | 1997 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,601 | $7,400 | Implemented |
SF0107 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,713 | $0 | Implemented |
SF0107 # 06 Y:1997 | 06 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,365 | $3,180 | Not Implemented |
SF0107 # 07 Y:1997 | 07 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,395 | $0 | Implemented |
SF0107 # 08 Y:1997 | 08 | 1997 | INSULATE BARE EQUIPMENT | $766 | $2,301 | Implemented |
SF0107 # 09 Y:1997 | 09 | 1997 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $7,120 | $5,285 | Not Implemented |
SF0107 # 10 Y:1997 | 10 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $2,543 | $1,200 | Not Implemented |
SF0107 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $119 | $11,984 | Implemented |