Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0867 # 10 Y:2012 | 10 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,097 | $0 | Implemented |
UD0867 # 09 Y:2012 | 09 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $23,710 | $0 | Not Implemented |
UD0867 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,474 | $10,000 | Not Implemented |
UD0867 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,916 | $0 | Not Implemented |
UD0867 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,942 | $1,000 | Implemented |
UD0867 # 05 Y:2012 | 05 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,787 | $15,000 | Not Implemented |
UD0867 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,831 | $0 | Not Implemented |
UD0867 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,088 | $10,618 | Implemented |
UD0867 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,726 | $35,503 | Implemented |
UD0867 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,897 | $12,947 | Implemented |
OR0588 # 03 Y:2012 | 03 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,021 | $10,000 | Not Implemented |
OR0588 # 06 Y:2012 | 06 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $631 | $4,131 | Not Implemented |
OR0588 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $17,738 | $17,500 | Implemented |
OR0588 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,053 | $8,053 | Implemented |
OR0588 # 02 Y:2012 | 02 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $8,968 | $0 | Not Implemented |
OR0588 # 01 Y:2012 | 01 | 2012 | IMPROVE HANDLING PRACTICES | $7,884 | $60 | Implemented |
IA0485 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $688 | $525 | Implemented |
IA0485 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,133 | $1,343 | Implemented |
IA0485 # 04 Y:2012 | 04 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,683 | $1,560 | Not Implemented |
IA0485 # 05 Y:2012 | 05 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $774 | $989 | Implemented |
IA0485 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,660 | $273 | Implemented |
IA0485 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $893 | $882 | Implemented |
IA0485 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,511 | $2,009 | Implemented |
IA0485 # 07 Y:2012 | 07 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,493 | $2,044 | Implemented |
IA0485 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $3,310 | Not Implemented |