Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0938 # 12 Y:2016 | 12 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,836 | $1,371,615 | Not Implemented |
OK0938 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $34,651 | $40,660 | Not Implemented |
OK0938 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,405 | $59,664 | Implemented |
OK0938 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,558 | $4,930 | Not Implemented |
OK0938 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,124 | $3,000 | Not Implemented |
OK0938 # 05 Y:2016 | 05 | 2016 | INSTALL SET-BACK TIMERS | $317 | $344 | Implemented |
OK0938 # 06 Y:2016 | 06 | 2016 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $5,044 | $44,525 | Not Implemented |
OK0938 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $4,491 | $2,935 | Not Implemented |
OK0938 # 08 Y:2016 | 08 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,294 | $5,000 | Not Implemented |
OK0938 # 09 Y:2016 | 09 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,693 | $3,236 | Implemented |
OK0938 # 10 Y:2016 | 10 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $372,611 | $70,000 | Not Implemented |
OK0938 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $26,300 | $47,542 | Implemented |
WM0083 # 01 Y:2016 | 01 | 2016 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $61,468 | $22,995 | Not Implemented |
WM0083 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $34,888 | $8,785 | Not Implemented |
WM0083 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $27,491 | $7,200 | Implemented |
WM0083 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,901 | $15,200 | Implemented |
WM0083 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $12,261 | $1,680 | Not Implemented |
WM0083 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,673 | $1,425 | Implemented |
WM0083 # 07 Y:2016 | 07 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,105 | $2,490 | Implemented |
WM0083 # 08 Y:2016 | 08 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $273 | $695 | Not Implemented |
CO0720 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $300 | Implemented |
CO0720 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $930 | $1,330 | Not Implemented |
CO0720 # 04 Y:2016 | 04 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $5,510 | $27,600 | Not Implemented |
CO0720 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,190 | $67,155 | Implemented |
CO0720 # 01 Y:2016 | 01 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,640 | $62,670 | Not Implemented |