Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0111 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,637 $100 Implemented
UA0111 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,878 $2,530 Implemented
UA0111 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,225 $851 Implemented
GT0680 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $38,165 $11,480 Not Implemented
GT0680 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,057 $4,527 Implemented
GT0680 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $1,120 $2,000 Not Implemented
GT0680 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,310 $450 Implemented
GT0680 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,098 $3,500 Not Implemented
GT0680 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,848 $0 Not Implemented
GT0623 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $120 Not Implemented
GT0623 # 08 Y:1997 08 1997 MOVE PRODUCT USING MECHANICAL MEANS $4,130 $2,500 Implemented
GT0623 # 07 Y:1997 07 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $765 $0 Not Implemented
GT0623 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $1,300 Not Implemented
GT0623 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $220 $1,200 Implemented
GT0623 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $100 Implemented
GT0623 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $300 Not Implemented
GT0623 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $300 $390 Not Implemented
GT0351 # 06 Y:1988 06 1988 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $690 $300 Not Implemented
GT0351 # 05 Y:1988 05 1988 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,560 $4,190 Not Implemented
GT0351 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $920 $540 Not Implemented
GT0351 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36 $25 Not Implemented
GT0351 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $373 $2,000 Not Implemented
GT0351 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $600 $0 Not Implemented
GT0239 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $1,657 $190 Not Implemented
GT0239 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,527 $1,000 Not Implemented