IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 3087 Custom Compound Purchased Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0125 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,007 $17,900 n/a
CW0125 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37,427 $1,156 n/a
CW0125 # 04 Y:2022 04 2022 USE SYNTHETIC LUBRICANT $18,816 $9,059 n/a
CW0125 # 05 Y:2022 05 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $23,398 $56,000 n/a
CW0125 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $70,112 $8,000 n/a
CW0125 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,449 $25,995 n/a
CW0125 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $63,307 $41,871 n/a
CW0125 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,655 $2,019 n/a
UD1036 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,417 $0 Not Implemented
UD1036 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,141 $0 Not Implemented
UD1036 # 02 Y:2022 02 2022 COMBINE UTILITY METERS $309 $0 Not Implemented
UD1036 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,661 $250 Not Implemented
UD1036 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,150 $0 Not Implemented
UD1036 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,379 $316 Not Implemented
UD1036 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $0 Not Implemented
UD1036 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,509 $20,000 Not Implemented
UD1036 # 09 Y:2022 09 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,334 $63,686 Not Implemented
UD1036 # 10 Y:2022 10 2022 INSTALL OCCUPANCY SENSORS $1,706 $3,200 Not Implemented
WV0537 # 01 Y:2017 01 2017 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $86,765 $200,500 Not Implemented
WV0537 # 14 Y:2017 14 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $992 $631 Implemented
WV0537 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,706 $678 Implemented
WV0537 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $25 Implemented
WV0537 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $1,909 $943 Implemented
WV0537 # 08 Y:2017 08 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,323 $2,700 Not Implemented
WV0537 # 12 Y:2017 12 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $1,686 $700 Not Implemented