IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3087 Custom Compound Purchased Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0264 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,103 $2,500 Implemented
LE0264 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,204 $2,000 Implemented
LE0264 # 04 Y:2007 04 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,727 $2,250 Not Implemented
LE0264 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $500 Implemented
LE0264 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,514 $200 Not Implemented
LE0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Implemented
LE0264 # 08 Y:2007 08 2007 USE SYNTHETIC LUBRICANT $3,151 $500 Not Implemented
LE0264 # 09 Y:2007 09 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,674 $5,000 Not Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
LE0264 # 11 Y:2007 11 2007 INSTALL OCCUPANCY SENSORS $3,069 $750 Not Implemented
LE0264 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,680 $50,000 Implemented
UM0324 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $7,222 $6,917 Implemented
UM0324 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,978 $0 Implemented
UM0324 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,631 $4,000 Not Implemented
UM0324 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $5,954 $543 Not Implemented
UM0324 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,396 $2,140 Not Implemented
UD0753 # 06 Y:2007 06 2007 USE RADIANT HEATER FOR SPOT HEATING $10,800 $15,600 Implemented
UD0753 # 07 Y:2007 07 2007 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $8,390 $15,000 Implemented
UD0753 # 08 Y:2007 08 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,105 $16,500 Not Implemented
UD0753 # 09 Y:2007 09 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,816 $0 Implemented
UD0753 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,007 $0 Not Implemented
UD0753 # 11 Y:2007 11 2007 USE OPTIMUM TEMPERATURE $998 $0 Implemented
UD0753 # 12 Y:2007 12 2007 OPTIMIZE PLANT POWER FACTOR $864 $9,000 Not Implemented
UD0753 # 13 Y:2007 13 2007 UPGRADE CONTROLS ON COMPRESSORS $299 $3,800 Not Implemented
UD0753 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $11,994 $7,875 Implemented