IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,842

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0486 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $576 Implemented
UD0397 # 01 Y:1993 01 1993 COMBINE UTILITY METERS $838 $200 Implemented
UD0397 # 02 Y:1993 02 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,462 $100 Implemented
UD0397 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $445 $20 Implemented
CO0270 # 01 Y:1993 01 1993 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,400 $250 Implemented
CO0270 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,020 $2,500 Implemented
CO0270 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,450 $2,850 Implemented
CO0271 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,060 $400 Implemented
CO0271 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,640 $400 Implemented
CO0271 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,260 $2,500 Implemented
CO0271 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,634 $37,430 Implemented
UD0392 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,218 $0 Implemented
UD0392 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,501 $54,400 Implemented
UD0392 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,274 $0 Implemented
UD0392 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,755 $1,000 Implemented
UD0392 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,469 $630 Implemented
UD0383 # 01 Y:1992 01 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,953 $500 Implemented
UD0383 # 02 Y:1992 02 1992 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $8,673 $2,000 Implemented
UD0383 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,389 $400 Implemented
UD0383 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,329 $13,345 Implemented
AS0073 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,226 $5,173 Implemented
AS0073 # 02 Y:1992 02 1992 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,610 $9,350 Implemented
AS0073 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $245 $400 Implemented
AS0073 # 04 Y:1992 04 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,325 $0 Implemented
AS0073 # 05 Y:1992 05 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,124 $6,200 Implemented