IAC logo
IAC Assessment: SD0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1994
Principal Product Underground Vaults
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 5,148
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $195,894 1,834,994 kWh $0.11
TOTAL ENERGY COSTS $195,894
RECOMMENDED SAVINGS* $46,748 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,929
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,797
Cost:
$7,970
$6,797 63,599 $6,797
63,599
kWh
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$11,493
Cost:
$4,560
$11,493 107,562 $11,493
107,562
kWh
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,889
Cost:
$1,660
$3,889 36,342 $3,889
36,342
kWh
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,631
Cost:
$386
$2,631 24,619 $2,631
24,619
kWh
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,870
Cost:
$265
$4,870 45,721 $4,870
45,721
kWh
06: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$7,823
Cost:
-
$7,823 - $7,823
-
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,132
Cost:
$13,324
$3,132 27,550 $3,132
27,550
kWh
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,188
Cost:
$2,670
$2,188 19,343 $2,188
19,343
kWh
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$877
Cost:
$920
$877 7,620 $877
7,620
kWh
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,048
Cost:
$300
$3,048 28,429 $3,048
28,429
kWh
TOTAL RECOMMENDED Savings:
$46,748
Cost:
$32,055
$46,748 360,785 $46,748
360,785
kWh
TOTAL IMPLEMENTED Savings:
$9,929
Cost:
$21,294
$9,929 91,149 $9,929
91,149
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage