IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,860

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0171 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $177 Implemented
RU0076 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,666 $650 Implemented
RU0076 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $229 $81 Implemented
RU0076 # 06 Y:1990 06 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $420 $279 Implemented
RU0076 # 07 Y:1990 07 1990 REPAIR AND ELIMINATE STEAM LEAKS $6,284 $325 Implemented
MA0167 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,507 $197 Implemented
KU0298 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,437 $382 Implemented
KU0298 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $76 Implemented
KU0298 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,572 $100 Implemented
KU0298 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $261 $300 Implemented
KU0298 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $727 $310 Implemented
KU0298 # 10 Y:1989 10 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $361 $0 Implemented
KU0298 # 11 Y:1989 11 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $120 $0 Implemented
GT0386 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95 $58 Implemented
GT0386 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $83 $0 Implemented
GT0386 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $69 $80 Implemented
GT0386 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $339 $0 Implemented
GT0386 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $20 Implemented
GT0386 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $921 $150 Implemented
GT0386 # 08 Y:1989 08 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,015 $39,300 Implemented
KU0286 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $6,446 Implemented
KU0286 # 02 Y:1989 02 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $235 $0 Implemented
KU0286 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,139 $500 Implemented
KU0286 # 04 Y:1989 04 1989 INSTALL AUTOMATIC STACK DAMPER $6,820 $5,625 Implemented
KU0286 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,698 $1,800 Implemented