IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,860

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0005 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,350 $1,354 Implemented
ST0005 # 02 Y:1984 02 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,321 $720 Implemented
ST0005 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $1,210 $350 Implemented
ST0005 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,781 $32 Implemented
ST0005 # 05 Y:1984 05 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,348 $0 Implemented
ST0005 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,698 $269 Implemented
ST0005 # 07 Y:1984 07 1984 RECOVER WASTE HEAT FROM EQUIPMENT $4,579 $268 Implemented
ST0005 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $926 $269 Implemented
ST0005 # 09 Y:1984 09 1984 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $866 $846 Implemented
ST0006 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,274 $537 Implemented
ST0006 # 02 Y:1984 02 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $64 $0 Implemented
ST0006 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,291 $48 Implemented
ST0006 # 07 Y:1984 07 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,044 $0 Implemented
GT0229 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $6,010 $2,400 Implemented
GT0229 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,057 $1,000 Implemented
GT0229 # 04 Y:1984 04 1984 REPAIR AND ELIMINATE STEAM LEAKS $575 $50 Implemented
GT0229 # 06 Y:1984 06 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $645 $368 Implemented
GT0229 # 07 Y:1984 07 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,404 $1,270 Implemented
GT0229 # 08 Y:1984 08 1984 INSTALL SET-BACK TIMERS $330 $0 Implemented
GT0229 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $50 $150 Implemented
CO0005 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,113 $1,027 Implemented
CO0005 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $412 $828 Implemented
CO0005 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,026 $130 Implemented
CO0005 # 07 Y:1984 07 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,490 $2,900 Implemented
MA0002 # 01 Y:1984 01 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,889 $200 Implemented