IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

294

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0032 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,972 $3,600 Implemented
CO0032 # 06 Y:1985 06 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $596 $1,500 Implemented
CO0032 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $1,500 Implemented
CO0022 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $812 Implemented
CO0022 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $235 $300 Implemented
CO0022 # 03 Y:1985 03 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,655 $5,000 Not Implemented
CO0022 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,408 $2,500 Not Implemented
CO0022 # 05 Y:1985 05 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $111 $100 Implemented
CO0022 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,775 $100 Implemented
CO0022 # 07 Y:1985 07 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,991 $4,000 Not Implemented
CO0022 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $898 $100 Implemented
CO0022 # 09 Y:1985 09 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $253 $12 Implemented
CO0022 # 10 Y:1985 10 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $77 $0 Implemented
CO0005 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,113 $1,027 Implemented
CO0005 # 03 Y:1984 03 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,622 $5,000 Not Implemented
CO0005 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $202 $250 Not Implemented
CO0005 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $412 $828 Implemented
CO0005 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,026 $130 Implemented
CO0005 # 07 Y:1984 07 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,490 $2,900 Implemented