IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

837

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0079 # 02 Y:2004 02 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $846 $30 Not Implemented
LM0079 # 03 Y:2004 03 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,758 $8,250 Not Implemented
LM0079 # 04 Y:2004 04 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,000 $3,122 Not Implemented
LM0079 # 05 Y:2004 05 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,045 $0 Not Implemented
SF0280 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,196 $0 Implemented
SF0280 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,368 $7,023 Not Implemented
SF0280 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,656 $2,160 Implemented
SF0280 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,356 $8,280 Implemented
LM0072 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,620 $0 Implemented
LM0072 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $0 Implemented
LM0072 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,713 $17,500 Not Implemented
LM0072 # 04 Y:2004 04 2004 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,061 $0 Implemented
LM0072 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $102 $96 Implemented
LM0072 # 06 Y:2004 06 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,201 $0 Implemented
SF0267 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,672 $0 Implemented
SF0267 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,510 $0 Implemented
SF0267 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,968 $3,164 Not Implemented
SF0267 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,638 $877 Not Implemented
SF0267 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,641 $10,047 Not Implemented
SF0267 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $39,106 $0 Implemented
SF0267 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,821 $3,895 Implemented
SF0267 # 08 Y:2003 08 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,465 $60,181 Not Implemented
SF0267 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,206 $3,741 Implemented
SF0267 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,536 $38,576 Not Implemented
SF0267 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,587 $34,108 Not Implemented