IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0108 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,872 $1,425 Not Implemented
UA0108 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,603 $2,591 Implemented
UA0108 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,894 $490 Implemented
UA0108 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $145 $607 Not Implemented
UA0108 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $4,734 $858 Implemented
UA0108 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,900 Implemented
UA0108 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,157 $800 Implemented
UA0080 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $15,904 $7,093 Not Implemented
UA0080 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $632 $270 Implemented
UA0080 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $981 $364 Implemented
UA0080 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,884 $6,195 Not Implemented
UA0080 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,321 $480 Implemented
UA0080 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,157 $1,443 Not Implemented
UA0019 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $377 $520 Implemented
UA0019 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,934 $3,000 Implemented
UA0019 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,527 $0 Implemented
UA0019 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $426 $2,016 Implemented
UA0019 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,534 $106,743 Not Implemented
UA0019 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $4,299 Not Implemented
UA0019 # 06 Y:2008 06 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,660 $0 Implemented
UA0019 # 08 Y:2008 08 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,641 $11,901 Not Implemented
UA0019 # 09 Y:2008 09 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,953 $0 Not Implemented
UA0019 # 10 Y:2008 10 2008 USE RADIANT HEATER FOR SPOT HEATING $46,005 $22,000 Not Implemented
UA0019 # 11 Y:2008 11 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $48,714 $9,100 Not Implemented
MS0109 # 07 Y:1998 07 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,287 $0 Implemented