IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0440 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $500 Not Implemented
AS0440 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,622 $15,120 Not Implemented
AS0417 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT WATER $346 $2,800 Not Implemented
AS0417 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $452 $300 Not Implemented
AS0417 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $7,797 Not Implemented
AS0417 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $4,692 $10,000 Not Implemented
AS0417 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $9,586 $200 Not Implemented
AS0417 # 02 Y:2006 02 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,507 $12,000 Not Implemented
AS0417 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,690 $1,000 Not Implemented
AS0417 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $20,720 $27,407 Not Implemented
AS0417 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,247 $10,000 Not Implemented
AS0322 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $346 $1,200 n/a
AS0322 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,056 $3,042 n/a
AS0322 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,742 $16,800 n/a
AS0322 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $4,955 n/a
AS0322 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,861 $260 n/a
AS0322 # 09 Y:2002 09 2002 MODIFY STARTUP/SHUTDOWN TIMES $21,858 $486 n/a
AS0322 # 07 Y:2002 07 2002 MINIMIZE WATER USAGE $775 $60 n/a
AS0322 # 08 Y:2002 08 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $77,282 $10,792 n/a
AS0322 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $784 $975 n/a
AS0298 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,334 $90 Not Implemented
AS0298 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $2,099 $11,395 Not Implemented
AS0298 # 05 Y:2001 05 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $960 $60 Not Implemented
AS0298 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,767 $11,030 Not Implemented
AS0298 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $154 $375 Not Implemented