Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
434
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0490 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,902 | $3,069 | Implemented |
BD0490 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,072 | $1,500 | Not Implemented |
BD0490 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $14,526 | $1,150 | Not Implemented |
BD0490 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $630 | $800 | Implemented |
BD0490 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,025 | $2,501 | Not Implemented |
WM0088 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,531 | $6,000 | Not Implemented |
WM0088 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $75,376 | $50,000 | Not Implemented |
WM0088 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,245 | $0 | Implemented |
WM0088 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,075 | $501 | Not Implemented |
WM0088 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $71,275 | $132,797 | Not Implemented |
WM0088 # 05 Y:2016 | 05 | 2016 | METER WASTE WATER | $4,267 | $375 | Not Implemented |
WM0088 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,940 | $28,000 | Not Implemented |
BD0466 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,192 | $15,910 | Not Implemented |
BD0466 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,362 | $20 | Not Implemented |
BD0466 # 08 Y:2015 | 08 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $921 | $648 | Implemented |
BD0466 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,559 | $8,515 | Implemented |
BD0466 # 02 Y:2015 | 02 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $11,592 | $36,000 | Not Implemented |
BD0466 # 01 Y:2015 | 01 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,003 | $15,800 | Implemented |
BD0466 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $1,000 | Not Implemented |
BD0466 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $899 | $1,275 | Implemented |
BD0466 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $25 | Implemented |
BD0466 # 06 Y:2015 | 06 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $2,803 | $2,200 | Not Implemented |
BD0466 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,541 | $8,170 | Implemented |
BD0458 # 07 Y:2015 | 07 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,421 | $105 | Implemented |
BD0458 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $3,722 | $3,900 | Implemented |