Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0112 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,560 | $0 | Implemented |
NV0112 # 03 Y:1998 | 03 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $16,667 | $9,361 | Not Implemented |
NV0112 # 06 Y:1998 | 06 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,277 | $230 | Not Implemented |
NV0112 # 05 Y:1998 | 05 | 1998 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $550,755 | $48,000 | Not Implemented |
NV0105 # 07 Y:1998 | 07 | 1998 | USE PHOTOCELL CONTROLS | $1,872 | $490 | Not Implemented |
NV0105 # 10 Y:1998 | 10 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $52,000 | $14,200 | Implemented |
NV0105 # 09 Y:1998 | 09 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $2,679 | $8,064 | Implemented |
NV0105 # 03 Y:1998 | 03 | 1998 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,061 | $0 | Implemented |
NV0105 # 12 Y:1998 | 12 | 1998 | REDUCE SCRAP PRODUCTION | $64,064 | $375,750 | Implemented |
NV0105 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,488 | $1,080 | Implemented |
NV0105 # 04 Y:1998 | 04 | 1998 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $1,030 | $1,267 | Implemented |
NV0105 # 06 Y:1998 | 06 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $322 | $150 | Not Implemented |
NV0105 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,676 | $50,495 | Not Implemented |
NV0105 # 11 Y:1998 | 11 | 1998 | REDUCE SCRAP PRODUCTION | $12,952 | $75,000 | Not Implemented |
NV0105 # 02 Y:1998 | 02 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,271 | $21,600 | Implemented |
NV0105 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,700 | $1,890 | Not Implemented |
NV0100 # 06 Y:1998 | 06 | 1998 | UTILIZE OUTSIDE CONTRACTING | $42,320 | $25,000 | Not Implemented |
NV0100 # 05 Y:1998 | 05 | 1998 | USE PHOTOCELL CONTROLS | $2,667 | $495 | Implemented |
NV0100 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $443 | $135 | Implemented |
NV0100 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,558 | $1,890 | Not Implemented |
NV0100 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $233 | $326 | Implemented |
NV0100 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $917 | $150 | Implemented |
NV0092 # 01 Y:1997 | 01 | 1997 | INSTALL OCCUPANCY SENSORS | $712 | $246 | Not Implemented |
NV0092 # 07 Y:1997 | 07 | 1997 | INSULATE BARE EQUIPMENT | $6,347 | $716 | Implemented |
NV0092 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,147 | $60 | Implemented |