Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1998 |
Principal Product | Plastic Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 112,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $144,601 | 3,408,851 | kWh | $0.04 |
Electricity Demand | $60,967 | 7,776 | kW-months/year | $7.84 |
Electricity Fees | $8,426 | - | $ | - |
Natural Gas | $21,084 | 3,683 | MMBtu | $5.72 |
TOTAL ENERGY COSTS | $235,078 | |||
RECOMMENDED SAVINGS* | $173,115 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $140,593 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,700 Cost: $1,890 |
- | - | - | - | - | - | $2,700 | 472 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,700 472 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $9,271 Cost: $21,600 |
$7,687 | 181,125 | $2,131 | 272 | $196 | - | - | - | - | - | - | - | - | - | $(-743) | - |
$7,687 181,125 kWh |
$2,131 272 kW-months/year |
$196 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$(-743) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $2,061 Cost: - |
$1,491 | 35,170 | $530 | 68 | $40 | - | - | - | - | - | - | - | - | - | - | - |
$1,491 35,170 kWh |
$530 68 kW-months/year |
$40 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5125 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE |
Savings: $1,030 Cost: $1,267 |
$745 | 17,585 | $265 | 34 | $20 | - | - | - | - | - | - | - | - | - | - | - |
$745 17,585 kWh |
$265 34 kW-months/year |
$20 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $9,488 Cost: $1,080 |
$4,770 | 112,544 | $4,532 | 578 | $186 | - | - | - | - | - | - | - | - | - | - | - |
$4,770 112,544 kWh |
$4,532 578 kW-months/year |
$186 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $322 Cost: $150 |
$316 | 7,327 | - | - | $6 | - | - | - | - | - | - | - | - | - | - | - |
$316 7,327 kWh |
- - kW-months/year |
$6 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,872 Cost: $490 |
$1,429 | 33,705 | $406 | 52 | $37 | - | - | - | - | - | - | - | - | - | - | - |
$1,429 33,705 kWh |
$406 52 kW-months/year |
$37 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,676 Cost: $50,495 |
$10,615 | 250,293 | $3,773 | 481 | $288 | - | - | - | - | - | - | - | - | - | - | - |
$10,615 250,293 kWh |
$3,773 481 kW-months/year |
$288 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $2,679 Cost: $8,064 |
- | - | - | - | - | - | $2,679 | 468 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,679 468 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
Savings: $52,000 Cost: $14,200 |
- | - | - | - | - | - | - | - | - | - | - | - | $52,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
$52,000 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $12,952 Cost: $75,000 |
$4,368 | 102,872 | $1,552 | 198 | - | - | - | - | $792 | 39,600 | $6,240 | - | - | - | - | - |
$4,368 102,872 kWh |
$1,552 198 kW-months/year |
- - $ |
- - MMBtu |
$792 39,600 lb |
$6,240 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $64,064 Cost: $375,750 |
- | - | - | - | - | - | - | - | $64,064 | 22,460 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$64,064 22,460 lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $173,115 Cost: $549,986 |
$31,421 | 740,621 | $13,189 | 1,683 | $773 | - | $5,379 | 940 | $64,856 | 62,060 | $6,240 | - | $52,000 | - | $(-743) | - | $31,421 740,621 kWh |
$13,189 1,683 kW-months/year |
$773 - $ |
$5,379 940 MMBtu |
$64,856 62,060 lb |
$6,240 - $ |
$52,000 - $ |
$(-743) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $140,593 Cost: $421,961 |
$14,693 | 346,424 | $7,458 | 952 | $442 | - | $2,679 | 468 | $64,064 | 22,460 | - | - | $52,000 | - | $(-743) | - | $14,693 346,424 kWh |
$7,458 952 kW-months/year |
$442 - $ |
$2,679 468 MMBtu |
$64,064 22,460 lb |
- - $ |
$52,000 - $ |
$(-743) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Water Consumption |