IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

837

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0178 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,849 $100 Implemented
SD0178 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $2,400 $2,250 Implemented
SD0178 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,073 $4,231 Implemented
SD0178 # 06 Y:1997 06 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $1,663 $955 Implemented
SD0178 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,800 $6,000 Implemented
SD0178 # 08 Y:1997 08 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $12,985 $0 Implemented
SD0178 # 09 Y:1997 09 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,620 $9,000 Implemented
SD0178 # 10 Y:1997 10 1997 MODIFY MATERIAL APPLICATION METHODS $1,620 $2,600 Implemented
SD0178 # 11 Y:1997 11 1997 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $261,063 $9,000 Not Implemented
SD0178 # 12 Y:1997 12 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $75,000 $20,000 Implemented
SD0164 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $50,256 $53,800 Implemented
SD0164 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $241,567 $538,000 Implemented
SD0164 # 03 Y:1997 03 1997 REPLACE BOILER $204,328 $78,000 Not Implemented
SD0164 # 04 Y:1997 04 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $17,052 $9,016 Implemented
SD0164 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,242 $1,500 Implemented
SD0164 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $704 $0 Implemented
SD0164 # 07 Y:1997 07 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $47,553 $80,200 Not Implemented
SD0164 # 08 Y:1997 08 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,700 $15,000 Not Implemented
SD0164 # 09 Y:1997 09 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,250 $0 Implemented
SD0164 # 10 Y:1997 10 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,000 $0 Implemented
SD0164 # 11 Y:1997 11 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $6,000 $0 Implemented
SD0164 # 12 Y:1997 12 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $496 $0 Implemented
SD0164 # 13 Y:1997 13 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $164,025 $20,000 Implemented
SD0164 # 14 Y:1997 14 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $29,160 $1,000 Implemented
SD0164 # 15 Y:1997 15 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,450 $8,000 Implemented