Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
990
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0217 # 01 Y:1987 | 01 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,538 | $5,000 | Implemented |
UD0217 # 02 Y:1987 | 02 | 1987 | REDUCE GLAZED AREAS IN BUILDINGS | $3,993 | $20,000 | Implemented |
UD0217 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,444 | $1,000 | Implemented |
UD0217 # 04 Y:1987 | 04 | 1987 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,387 | $50,000 | Not Implemented |
UD0205 # 01 Y:1986 | 01 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,692 | $708 | Implemented |
UD0205 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,886 | $5,000 | Implemented |
UD0205 # 03 Y:1986 | 03 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,480 | $52,200 | Implemented |
UD0205 # 04 Y:1986 | 04 | 1986 | INSTALL STORM WINDOWS AND DOORS | $6,617 | $6,040 | Not Implemented |
UD0205 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,237 | $12,000 | Implemented |
UD0205 # 06 Y:1986 | 06 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,622 | $11,000 | Implemented |
UD0192 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,234 | $2,500 | Implemented |
UD0192 # 02 Y:1986 | 02 | 1986 | REDUCE VENTILATION AIR | $4,173 | $2,500 | Implemented |
UD0151 # 01 Y:1985 | 01 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $162 | $0 | Not Implemented |
UD0151 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $1,349 | $315 | Implemented |
UD0151 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $795 | $284 | Not Implemented |
UD0147 # 01 Y:1984 | 01 | 1984 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $5,049 | $2,250 | Implemented |
UD0147 # 02 Y:1984 | 02 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $521 | $600 | Implemented |
UD0147 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,487 | $346 | Implemented |
UD0147 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,055 | $700 | Implemented |
UD0147 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $588 | $680 | Implemented |
UD0122 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $8,037 | $2,800 | Implemented |
UD0122 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,523 | $1,000 | Implemented |
UD0122 # 03 Y:1984 | 03 | 1984 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $530 | $1,000 | Not Implemented |
UD0122 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $177 | $73 | Implemented |
UD0094 # 01 Y:1983 | 01 | 1983 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,749 | $55,800 | Not Implemented |