IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0426 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,407 $1,500 Implemented
UM0426 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,226 $1,000 Implemented
UM0403 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $538 $200 Not Implemented
UM0403 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $921 $1,000 Not Implemented
UM0403 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,116 $16,500 Not Implemented
UM0403 # 02 Y:2012 02 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,872 $1,175 Not Implemented
UM0403 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,740 $6,369 Implemented
UM0401 # 04 Y:2012 04 2012 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,066 $448 Implemented
UM0401 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,019 $5,000 Implemented
UM0401 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $5,655 $21,250 Not Implemented
UM0401 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,538 $1,500 Not Implemented
UM0390 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,753 $200 Not Implemented
UM0390 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $11,887 $2,716 Not Implemented
UM0390 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,502 $10,000 Not Implemented
UM0390 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $109,437 $163,095 Not Implemented
UM0390 # 05 Y:2011 05 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $27,012 $59,940 Not Implemented
UM0390 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,628 $5,000 Not Implemented
UM0384 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Not Implemented
UM0384 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $5,000 Not Implemented
UM0384 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,389 $1,350 Not Implemented
UM0384 # 08 Y:2011 08 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $180 $10 Not Implemented
UM0384 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,902 $10,000 Not Implemented
UM0384 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Not Implemented
UM0384 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $6,227 $12,120 Not Implemented
UM0384 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,081 $38,947 Not Implemented