IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

217

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0555 # 05 Y:1998 05 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,911 $5,543 Not Implemented
OK0555 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,825 $0 Implemented
OK0555 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $6,214 $1,483 Not Implemented
OK0555 # 08 Y:1998 08 1998 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,557 $25,000 Not Implemented
OK0555 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,002 $320 Implemented
OK0555 # 10 Y:1998 10 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,823 $2,100 Implemented
OK0555 # 11 Y:1998 11 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,573 $5,000 Not Implemented
OK0555 # 12 Y:1998 12 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,948 $1,080 Not Implemented
OK0555 # 13 Y:1998 13 1998 INSTALL OCCUPANCY SENSORS $899 $585 Not Implemented
OK0413 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,243 $39,528 Implemented
OK0413 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,746 $19,728 Implemented
OK0413 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,510 $0 Implemented
OK0413 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $15,458 $7,400 Not Implemented
OK0413 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,401 $5,910 Not Implemented
OK0281 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $89 Implemented
OK0281 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $123 $240 Implemented
OK0281 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,427 $1,500 Implemented
OK0281 # 04 Y:1989 04 1989 REPAIR AND ELIMINATE STEAM LEAKS $26,441 $5,000 Implemented
OK0281 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $190 $448 Implemented
OK0281 # 06 Y:1989 06 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,803 $3,680 Implemented
OK0234 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,956 $210 Implemented
OK0234 # 02 Y:1987 02 1987 INSTALL SET-BACK TIMERS $4,799 $0 Not Implemented
OK0234 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $955 $1,920 Not Implemented
OK0234 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $703 $81 Implemented
OK0234 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $5,881 $10,000 Implemented