IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1094 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,672 $2,688 n/a
OK1094 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,239 $12,700 n/a
OK1094 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,890 $94,115 n/a
OK1094 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $93,859 $858,000 n/a
OK1094 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,917 $22,000 n/a
OK1094 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $573 $870 n/a
OK0934 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,990 $0 Not Implemented
OK0934 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,069 $10,000 Not Implemented
OK0934 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,615 $915 Not Implemented
OK0934 # 01 Y:2016 01 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $27,456 $25,000 Not Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0908 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $6,429 $11,430 Implemented
OK0908 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,662 $120 Not Implemented
OK0908 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $621 $432 Implemented
OK0908 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $7,829 $59,743 Not Implemented
TT0090 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $334 $0 Implemented
TT0090 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,764 $2,000 Implemented
TT0090 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $3,800 $7,225 Not Implemented
TT0090 # 08 Y:2012 08 2012 DEVELOP A REPAIR/REPLACE POLICY $2,350 $2,400 Implemented
TT0090 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,004 $54,507 Not Implemented
TT0090 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,200 $35,000 Not Implemented
TT0090 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,085 $0 Not Implemented
TT0090 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,008 $1,780 Implemented
TT0090 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $134 $525 Implemented