Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
241
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2318 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $224 | $765 | n/a |
KS2318 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,814 | $28,960 | n/a |
KS2318 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,203 | $60 | n/a |
KS2318 # 01 Y:2023 | 01 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $14,419 | $320 | n/a |
KS2318 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,077 | $421,486 | n/a |
KS2318 # 04 Y:2023 | 04 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,238 | $1,864 | n/a |
KS2318 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $8,951 | n/a |
GT0963 # 02 Y:2023 | 02 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,457 | $400 | Not Implemented |
GT0963 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $1,308 | $1,330 | Not Implemented |
GT0963 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,639 | $1,850 | Implemented |
GT0963 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,066 | $11,282 | Not Implemented |
GT0963 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $725 | $450 | Implemented |
GT0963 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,072 | $862,249 | Not Implemented |
GT0912 # 05 Y:2018 | 05 | 2018 | COMBINE UTILITY METERS | $1,715 | $2,614 | Not Implemented |
GT0912 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,774 | $17,795 | Implemented |
GT0912 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $39,033 | $804 | Implemented |
GT0912 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,273 | $150 | Implemented |
GT0912 # 02 Y:2018 | 02 | 2018 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,530 | $142 | Implemented |
GT0912 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,178 | $1,386 | Not Implemented |
GT0909 # 04 Y:2017 | 04 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,551 | $7,915 | Not Implemented |
GT0909 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,255 | $36,180 | Implemented |
GT0909 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,594 | $411 | Not Implemented |
GT0909 # 05 Y:2017 | 05 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $49,838 | $321,120 | Implemented |
GT0909 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $3,363 | $240 | Not Implemented |
GT0885 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,257 | $12,880 | Implemented |