IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

217

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1085 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,322 $2,730 Implemented
OK1085 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $15,984 $2,567 Implemented
OK1085 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,249 $820,666 Not Implemented
OK1085 # 05 Y:2023 05 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $564 $0 Implemented
OK1085 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,853 $0 Implemented
OK0985 # 01 Y:2018 01 2018 INSTALL SET-BACK TIMERS $758 $592 Not Implemented
OK0985 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $79,971 $7,481 Not Implemented
OK0985 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,033 $7,422 Implemented
OK0985 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,240 $19,498 Implemented
OK0985 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,769 $21,562 Implemented
OK0985 # 05 Y:2018 05 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,555 $3,157 Not Implemented
OK0976 # 08 Y:2017 08 2017 KEEP EQUIPMENT CLEAN $885 $240 Implemented
OK0976 # 06 Y:2017 06 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,094 $22,000 Not Implemented
OK0976 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $35,200 Not Implemented
OK0976 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,177 $240 Implemented
OK0976 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,176 $61,707 Implemented
OK0976 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,185 $3,480 Not Implemented
OK0976 # 01 Y:2017 01 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,812 $180,000 Implemented
OK0976 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,586 $3,840 Implemented
OK0964 # 11 Y:2017 11 2017 INSTALL SET-BACK TIMERS $5,720 $4,750 Not Implemented
OK0964 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,682 $38,281 Implemented
OK0964 # 08 Y:2017 08 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,602 $7,700 Not Implemented
OK0964 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,164 $3,000 Not Implemented
OK0964 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $4,260 Not Implemented
OK0964 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,155 $0 Not Implemented