Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
349
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0065 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $37,440 | $1,027 | Not Implemented |
TA0065 # 09 Y:2003 | 09 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $306 | $140 | Implemented |
TA0065 # 11 Y:2003 | 11 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $146 | $142 | Not Implemented |
TA0065 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,426 | $6,000 | Implemented |
TA0065 # 08 Y:2003 | 08 | 2003 | MOVE BOILER TO MORE EFFICIENT LOCATION | $1,422 | $1,894 | Implemented |
TA0065 # 01 Y:2003 | 01 | 2003 | REDESIGN PROCESS | $75,086 | $0 | Implemented |
TA0065 # 07 Y:2003 | 07 | 2003 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,793 | $0 | Implemented |
TA0065 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $64,800 | $5,200 | Implemented |
TA0065 # 05 Y:2003 | 05 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,900 | $0 | Implemented |
TA0065 # 10 Y:2003 | 10 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $194 | $0 | Not Implemented |
TA0065 # 03 Y:2003 | 03 | 2003 | USE "WASH-LESS" PROCESSING EQUIPMENT | $49,000 | $1,768 | Not Implemented |
UD0684 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,290 | $660 | Not Implemented |
UD0684 # 11 Y:2003 | 11 | 2003 | METER WASTE WATER | $1,513 | $2,000 | Not Implemented |
UD0684 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,792 | $100 | Not Implemented |
UD0684 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,252 | $8,000 | Not Implemented |
UD0684 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,780 | $0 | Not Implemented |
UD0684 # 12 Y:2003 | 12 | 2003 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $3,323 | $3,503 | Not Implemented |
UD0684 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,995 | $29,250 | Not Implemented |
UD0684 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,725 | $6,450 | Not Implemented |
UD0684 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,396 | $613 | Not Implemented |
UD0684 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,504 | $37,800 | Not Implemented |
UD0684 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $34,560 | $0 | Implemented |
UD0684 # 08 Y:2003 | 08 | 2003 | INSTALL COMMON HEADER ON COMPRESSORS | $3,865 | $0 | Not Implemented |
UD0684 # 14 Y:2003 | 14 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,207 | $4,000 | Not Implemented |
UD0684 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,700 | $770 | Not Implemented |