Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
214
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0925 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,024 | $10,944 | Not Implemented |
OK0925 # 11 Y:2015 | 11 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,100 | $9,690 | Not Implemented |
OK0925 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,930 | $9,328 | Not Implemented |
OK0925 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,762 | $933 | Implemented |
OK0925 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,255 | $71,792 | Not Implemented |
OK0925 # 06 Y:2015 | 06 | 2015 | USE COMPRESSOR AIR FILTERS | $757 | $362 | Implemented |
OK0925 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,128 | $65,326 | Not Implemented |
OK0925 # 07 Y:2015 | 07 | 2015 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $6,933 | $5,596 | Implemented |
OK0925 # 08 Y:2015 | 08 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,748 | $9,360 | Not Implemented |
OK0925 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $229 | Not Implemented |
OK0925 # 03 Y:2015 | 03 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $160 | $214 | Implemented |
SU0401 # 06 Y:2015 | 06 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $218 | $404 | Not Implemented |
SU0401 # 07 Y:2015 | 07 | 2015 | ELIMINATE/REDUCE AN OPERATION | $956 | $3,709 | Not Implemented |
IP0055 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,177 | $86 | Implemented |
SU0401 # 02 Y:2015 | 02 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $3,274 | $1,580 | Implemented |
SU0401 # 01 Y:2015 | 01 | 2015 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,820 | $0 | Implemented |
IP0055 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,460 | $3 | Implemented |
SU0401 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $383 | $240 | Implemented |
SU0401 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $964 | $469 | Not Implemented |
SU0401 # 05 Y:2015 | 05 | 2015 | REPLACE BOILER | $11,805 | $10,686 | Implemented |
IP0055 # 02 Y:2015 | 02 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,351 | $0 | Implemented |
IP0055 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,465 | $3 | Not Implemented |
IP0055 # 04 Y:2015 | 04 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,413 | $3 | Not Implemented |
IP0055 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,460 | $1,880 | Not Implemented |
IP0055 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $568 | $1,146 | Not Implemented |