IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0096 # 07 Y:1987 07 1987 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $22,563 $4,750 Implemented
MA0096 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,030 $3,900 Not Implemented
TN0314 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,593 $4,040 Implemented
TN0314 # 02 Y:1987 02 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,581 $16,250 Implemented
TN0314 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $7,234 $920 Not Implemented
TN0314 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $6,113 $0 Not Implemented
TN0314 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,182 $0 Not Implemented
TN0314 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $1,839 $1,160 Implemented
TN0314 # 07 Y:1987 07 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,779 $250 Implemented
LT0085 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,100 $2,000 Not Implemented
LT0085 # 02 Y:1987 02 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $290 $333 Implemented
LT0085 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $103 $202 Implemented
OK0229 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $114 $0 Implemented
OK0229 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $577 $0 Not Implemented
OK0229 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $0 Implemented
OK0229 # 04 Y:1987 04 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,236 $1,031 Implemented
OK0229 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $3,708 $2,200 Implemented
OK0229 # 06 Y:1987 06 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,856 $1,100 Not Implemented
OK0229 # 07 Y:1987 07 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,951 $3,660 Not Implemented
UD0237 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,394 $200 Implemented
UD0237 # 02 Y:1987 02 1987 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,466 $3,000 Implemented
UD0237 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,505 $1,790 Implemented
UD0237 # 04 Y:1987 04 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $697 $2,000 Implemented
UD0237 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,129 $0 Implemented
UD0237 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,305 $67 Implemented