IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

287

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0365 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $400 Not Implemented
ND0365 # 07 Y:2000 07 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,656 $250 Not Implemented
ND0365 # 10 Y:2000 10 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $2,569 Not Implemented
ND0365 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $1,000 Not Implemented
KU0553 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $374 $230 Not Implemented
KU0553 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $2,117 $3,116 Not Implemented
KU0553 # 01 Y:2000 01 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,828 $6,750 Not Implemented
KU0553 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,081 $90 Not Implemented
KU0553 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,466 $2,560 Not Implemented
KU0553 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $618 $494 Not Implemented
MA0473 # 07 Y:2000 07 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,770 $100 Not Implemented
MA0473 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $3,000 Implemented
MA0473 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,760 $1,200 Implemented
MA0473 # 09 Y:2000 09 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $936 $5,000 Not Implemented
MA0473 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,890 $140,000 Implemented
MA0473 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,269 $350 Implemented
MA0473 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,180 $0 Implemented
MA0473 # 10 Y:2000 10 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $1,250 Not Implemented
MA0473 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,924 $129,000 Implemented
MA0473 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,779 $7,000 Implemented
AM0381 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $290 Implemented
AM0381 # 05 Y:2000 05 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $275 $0 Implemented
AM0381 # 04 Y:2000 04 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $517 $1,034 Not Implemented
AM0381 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $16,000 $100 Implemented
AM0381 # 02 Y:2000 02 2000 RECOVER AND REUSE COOLING WATER $28,100 $2,300 Implemented