Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 314 | Footwear, Except Rubber |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0135 # 08 Y:1994 | 08 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $692 | $0 | Not Implemented |
ME0135 # 07 Y:1994 | 07 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,900 | $600 | Implemented |
ME0135 # 06 Y:1994 | 06 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,146 | $500 | Not Implemented |
ME0135 # 01 Y:1994 | 01 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $390 | $450 | Implemented |
ME0135 # 02 Y:1994 | 02 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $817 | $350 | Implemented |
ME0135 # 03 Y:1994 | 03 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,700 | $4,000 | Not Implemented |
ME0135 # 04 Y:1994 | 04 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $760 | $600 | Not Implemented |
ME0135 # 05 Y:1994 | 05 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,600 | $5,300 | Not Implemented |
ME0132 # 03 Y:1994 | 03 | 1994 | INSULATE BARE EQUIPMENT | $1,625 | $5,100 | Not Implemented |
ME0132 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $363 | $175 | Not Implemented |
ME0132 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,797 | $300 | Implemented |
ME0132 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,931 | $500 | Implemented |
ME0132 # 05 Y:1994 | 05 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $792 | $0 | Implemented |
ME0132 # 06 Y:1994 | 06 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $944 | $400 | Implemented |
ME0132 # 07 Y:1994 | 07 | 1994 | REPAIR AND ELIMINATE STEAM LEAKS | $286 | $75 | Implemented |
ME0132 # 08 Y:1994 | 08 | 1994 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $4,892 | $1,200 | Not Implemented |
ME0125 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,070 | $450 | Implemented |
ME0125 # 06 Y:1994 | 06 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $990 | $960 | Implemented |
ME0125 # 05 Y:1994 | 05 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $634 | $500 | Implemented |
ME0125 # 04 Y:1994 | 04 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $951 | $400 | Not Implemented |
ME0125 # 03 Y:1994 | 03 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $763 | $0 | Implemented |
ME0125 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $50 | Implemented |
ME0121 # 01 Y:1994 | 01 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,078 | $1,200 | Not Implemented |
ME0121 # 02 Y:1994 | 02 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,100 | $400 | Implemented |
ME0121 # 03 Y:1994 | 03 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $302 | $150 | Not Implemented |