Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 317 | Handbags And Personal Leather Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0053 # 05 Y:2023 | 05 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,027 | $2,500 | n/a |
TR0053 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,908 | $78,403 | n/a |
TR0053 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $960 | $1,000 | n/a |
TR0053 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,921 | $47,775 | n/a |
TR0053 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,176 | $6,207 | n/a |
SD0493 # 02 Y:2015 | 02 | 2015 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $8,026 | $34,300 | Not Implemented |
SD0493 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,823 | $1,400 | Implemented |
SD0493 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,368 | $3,042 | Not Implemented |
SD0493 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,141 | $1,250 | Implemented |
SD0493 # 06 Y:2015 | 06 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $939 | $200 | Not Implemented |
SD0493 # 01 Y:2015 | 01 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,509 | $14,580 | Not Implemented |
OK0864 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,176 | $10,642 | Implemented |
OK0864 # 09 Y:2013 | 09 | 2013 | USE FLUE GAS RECUPERATION TO REDUCE VOC | $79,353 | $32,100 | Implemented |
OK0864 # 08 Y:2013 | 08 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $127,574 | $25,000 | Not Implemented |
OK0864 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,158 | $10,250 | Implemented |
OK0864 # 04 Y:2013 | 04 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $5,084 | $0 | Implemented |
OK0864 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $2,872 | $1,478 | Not Implemented |
OK0864 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $655 | $1,128 | Not Implemented |
OK0864 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $33,277 | $58,900 | Not Implemented |
OK0864 # 05 Y:2013 | 05 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,999 | $27,500 | Not Implemented |
TA0133 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,060 | $367 | Implemented |
UF0187 # 09 Y:1997 | 09 | 1997 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $1,212,800 | $23,600 | Not Implemented |
UF0187 # 08 Y:1997 | 08 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $35,426 | $50,000 | Implemented |
UF0187 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $1,800 | $3,300 | Not Implemented |
UF0187 # 06 Y:1997 | 06 | 1997 | USE WATER-BASED ADHESIVES | $571 | $0 | Implemented |