IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 317 Handbags And Personal Leather Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0053 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,027 $2,500 n/a
TR0053 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,908 $78,403 n/a
TR0053 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $1,000 n/a
TR0053 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,921 $47,775 n/a
TR0053 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,176 $6,207 n/a
SD0493 # 02 Y:2015 02 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $8,026 $34,300 Not Implemented
SD0493 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,823 $1,400 Implemented
SD0493 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,368 $3,042 Not Implemented
SD0493 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,141 $1,250 Implemented
SD0493 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $939 $200 Not Implemented
SD0493 # 01 Y:2015 01 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,509 $14,580 Not Implemented
OK0864 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,176 $10,642 Implemented
OK0864 # 09 Y:2013 09 2013 USE FLUE GAS RECUPERATION TO REDUCE VOC $79,353 $32,100 Implemented
OK0864 # 08 Y:2013 08 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $127,574 $25,000 Not Implemented
OK0864 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,158 $10,250 Implemented
OK0864 # 04 Y:2013 04 2013 UPGRADE CONTROLS ON COMPRESSORS $5,084 $0 Implemented
OK0864 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,872 $1,478 Not Implemented
OK0864 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $655 $1,128 Not Implemented
OK0864 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $33,277 $58,900 Not Implemented
OK0864 # 05 Y:2013 05 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,999 $27,500 Not Implemented
TA0133 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,060 $367 Implemented
UF0187 # 09 Y:1997 09 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,212,800 $23,600 Not Implemented
UF0187 # 08 Y:1997 08 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,426 $50,000 Implemented
UF0187 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $1,800 $3,300 Not Implemented
UF0187 # 06 Y:1997 06 1997 USE WATER-BASED ADHESIVES $571 $0 Implemented